<description>All Saints Church is situated in West Dulwich, London. In June 2000 it was totally gutted by a massive fire, with only the solid Victorian walls surviving. Although insured, the money alone would not cover tall the rebuilding work. It was left to the All Saints Tomorrow Fund to co-ordinate an appeal to raise the outstanding funds. In 2003, Killby &amp; Gayford were selected as the main contractor in the Church's renovation.</description>
<language>en-gb</language>
<lastBuildDate>Tue, 12 Oct 2004 03:37:26 BST</lastBuildDate>
<copyright>Copyright 2004 Killby &amp; Gayford Group</copyright>
<image>
	<title>Killby &amp; Gayford Group</title>
	<width>168</width>
	<height>75</height>
	<link>http://www.killbygayford.co.uk/</link>
	<url>http://www.killbygayford.co.uk/images/b/bhome.jpg</url>
</image><item><title>24th September 2004</title><link>http://www.killbygayford.co.uk/allsaints/index.html</link><description><![CDATA[<ul><li>Installing tracery windows in lady chapel.</li>
<li>Leadwork nearing completion on the Bell Tower &amp; Chancel.</li>
<li>Lady Chapel roof joisting &amp; boarding installed.</li>
<li>Steel trusses to North Aisle &amp; Vestry in place.</li>
<li>Facing brickwork to the West End extension is now nearing the underside of nave slab.</li>
<li>New curved reinforced concrete column shutter is in place ready for the first concrete pour.</li></ul>]]></description></item><item><title>7th September 2004</title><link>http://www.killbygayford.co.uk/allsaints/index.html</link><description><![CDATA[<ul><li>North Bell Tower Roof has been fabricated at ground level then craned to roof and bolted into position.  Awaiting lead covering for completion.</li>
<li>Extensive works to reinforced retaining wall at the West End. Once complete the wall will have fairfaced red brick internal skin and curved Ashlar Bath stone external look.</li></ul>]]></description></item><item><title>11th August 2004</title><link>http://www.killbygayford.co.uk/allsaints/index.html</link><description><![CDATA[<ul><li>Installation of 25mm thick plywood to form the underside of the chancel roof.</li>
<li>New steel truss installation to the Nave roof.</li>
<li>Installation of toilets to crypt north aisle.</li>
<li>Installation of west end reinforcement to form the retaining wall.</li>
<li>Two bells from the USS Rodgers dated 1910 have been found in the bell tower. Launched in 1919 the USS Rodgers &#040;DD 254&#041; survived the First World War only to be decommissioned 1922. In 1940 the USS Rodgers was recommissioned and transferred to the Royal Navy as HMS Sherwood. Extensive service in the North Atlantic during the Second World War quickly took its toll and in 1943 HMS Sherwoord was decomissioned in Chatham docks. After being stripped of parts she was towed to the Humber, beached in shallow water and used as an aircraft target until 1945 when she was finally scrapped. How the bells &#040;now blacken by the blaze in 2000&#041; came to be hanging in the bell tower of All Saints Church is a mystery. A detailed description of HMS Sherwood's wartime exploits can be found on <a href="http://uboat.net/allies/warships/ship/4335.html" title="Uboat.net: HMS Sherwood">uboat.net</a>.</li></ul>]]></description></item><item><title>3rd August 2004</title><link>http://www.killbygayford.co.uk/allsaints/index.html</link><description><![CDATA[<ul><li>Laying of the Celotex insulation to Chancel roof.</li>
<li>Basement slab to the west end being poured.</li>
<li>Fixing of the nave ring beam ready for the steel roof truss installation.</li> </ul>]]></description></item><item><title>20th July 2004</title><link>http://www.killbygayford.co.uk/allsaints/index.html</link><description><![CDATA[<ul><li>Internal birdcage scaffold to the Nave complete.  This will allow for the steel roof trusses to be installed.</li>
<li>New Timber carcassing to Chancel roof.</li>
<li>Reinforcement to the west end to enable concrete to be poured. </li></ul>]]></description></item><item><title>7th July 2004</title><link>http://www.killbygayford.co.uk/allsaints/index.html</link><description><![CDATA[<ul><li>Unstable Vestry wall temporarily propped up to allow scaffolding  to progress.</li>
<li>Internal bird cage scaffold to Nave, North and South Aisles established to enable masonry repairs, and setting out of padstones for the new steel roof truss installation.</li>
<li>Removal of paintwork for existing fair faced brickwork in the Chancel.</li>
<li>New West End - Cordex insulation being laid to allow the floor slab to be poured.</li> </ul>]]></description></item><item><title>17th June 2004</title><link>http://www.killbygayford.co.uk/allsaints/index.html</link><description><![CDATA[<ul><li>New concrete slab for the Nave is poured and tamped.</li>
<li>Steel roof trusses in installed in Chancel.</li></ul>]]></description></item><item><title>10th June 2004</title><link>http://www.killbygayford.co.uk/allsaints/index.html</link><description><![CDATA[<ul><li>Preparing to pour the ground floor reinforced slab.</li>
<li>West end excavation and piling now complete - ready to construct basement.</li>
<li>Chancel scaffold now complete.</li></ul>]]></description></item><item><title>25th May 2004</title><link>http://www.killbygayford.co.uk/allsaints/index.html</link><description><![CDATA[<ul><li>The West End wall has now been demolished. 30&#037; of bricks have been kept for use later on in the project.</li>
<li>Excavation works by Shannon Civil Engineering now underway for the new West End entrance.</li>
<li>Installation of DPM &#040;Damp Proof Membrane&#041; for the new Toilet area on the north side of the church. A new reinforced concrete slab will be poured following this.</li></ul>]]></description></item><item><title>30th March 2004</title><link>http://www.killbygayford.co.uk/allsaints/index.html</link><description><![CDATA[<ul><li>Installation of site crane.</li>
<li>Break out of existing Nave floor slab.</li>
<li>Removal of all debris to be used to form access ramp for excavation/piling works at the west end.</li>
<li>Strip out and wash down of temporary flooring to Crypt Nave.</li></ul>]]></description></item></channel></rss>