Carrying out initial evaluation surveys with the client and Hospital staff to determine the optimum location to suit both their requirements, regarding accessibility and space…
Obtaining the original glazing manufacturers specification, designing suitable methodology for forming apertures for ATMs, gaining Landlord's approval for the necessary adaptions.
One of a planned roll out of 30 installations of Pods on South East Trains sites involving:
Preparing initial feasibility sketches, and survey documents to allow Network Rail consent to be obtained.
Carrying out all necessary builders and electrical works in connection with the ATM and Pod installation in accordance with the host's health & safety and induction procedures.